HOTEL AND LEISURE |
printable version |
![]() |
Point Village - Hotel, Theatre, Concert Venue and Offices

Architect: Scott Tallon Walker Architects
Main Contractor: Michael McNamara & Company
KCC Architectural supplied timber doors and ironmongery, supplied and installed fire resistant glazing, movable walls, fire curtains, fire shutters, steel doors, automatic doors and access controls systems.
Mandarin Oriental Hotel, Kensington

Architect: Richmond
Main Contractor: Lendlease
KCC were awarded the contract of supplying specialist door hardware to match the existing building type. In keeping with its original style, The Oriental Mandarin Hotel was fitted out with satin brass finished and polished brass finished hardware complementary to this impressive building.
Greenvale Leisure Centre

Architect: W&M Given Architects
Main Contractor: Heron Brothers
Electrical Contractor: HM Electrical
This project was for the installation of Northern Ireland’s first Olympic size swimming pool along with the refurbishment of the Leisure Centre. KCC Architectural supplied and installed the automatic operators, turn-style entrance systems and overhead doors closers At KCC we are continually seeking for the best of technology and innovation from our suppliers to create increasingly better environments - for all.
Shelbourne Hotel, Dublin

Architect: HKR Architects
Main Contractor: Michael McNamara & Co
KCC Architectural supplied and installed Steel Doors and Frames, Steel Frames, Fire Resistant Curtains, Ironmongery and Access Control Systems, Hotel Bedroom Entrance Systems to this prestigious 5* hotel in Dublins city centre.
02 Arena Dublin

Architect: HOK Sport Architecture, London
Main Contractor: Walls Construction
KCC Architectural supplied and installed Specialist Acoustic Doors, Steel Hinged Fire Doors and Fire Curtains to the project. The Acoustic Doors consisted of Vertically Lifting, Horizontal Sliding and Bi Parting Folding Doors some of which were 15m wide x 5m high. The doors were located around the stage area and provide the main entrance and exit points for equipment used during performances at the 02 Arena. Due to the size and complexity of the doors, significant structural supports had to be designed and installed into the building structure to carry and support the weight of the doors.
Ballyfermot Youth & Leisure Centre

Architect: McGary Ní Eanaigh Architects
Main Contractor: Ferrovial Agroman
KCC supplied and installed a range of Schuco Jansen satin brushed Stainless Steel glazing systems to the viewing area and changing areas, along with the feature frameless glazed armour plate door and screen assembly to the pool area. Being a swimming pool environment, the 316 grade stainless steel profiles were the obvious choice, having excellent corrosion resistant properties, they will stand the test of time for years to come.



